How to Overcome Geotechnical Challenges in Implementing High Speed Rail Systems in Australia

Geotechnical Engineering Journal of the SEAGS & AGSSEA ISSN 0046-5828

Vol. 45 No.1 March 2014

How to Overcome Geotechnical Challenges in Implementing High Speed Rail Systems in Australia

H. Khabbaz and B. Fatahi

ABSTRACT: Although there are a few medium speed rail systems in Australia, there is not a passenger rail transport with the high transit speed, seen in other countries. This paper firstly summarises lessons learnt from other countries, experienced high speed rail (HRS) for many years. Then, the challenges associated with implementing HSR systems in Australia are explained. The main challenges include selection and design of proper tracks, geographical issues, environmental concerns, economics and project costs and construction procedures. The second part of the paper presents the effective solutions to the geotechnical challenges associated with HSR systems. Various approaches are presented to improve the ballast layer properties and enhance the track formation bearing strength, stiffness, resiliency and dynamic properties. Employing concrete slab (ballast-less) tracks is also taken into consideration for HSR systems, and their performance is compared to ballasted tracks.

KEYWORDS: Geotechnical Challenges, Implementing, High Speed Rail Systems, Australia

DOI: 10.14456/seagj.2014.43